350 rub
Journal Information-measuring and Control Systems №12 for 2016 г.
Article in number:
Simulation of control system equipment repair enterprise
Keywords:
control system
repairing equipment
mathematical model
calendar planning
management of the object
the objective function
Authors:
K.S. Myshenkov - Dr.Sc. (Eng.), Professor, Department of Information Processing System and Management, Bauman Moscow State Technical University
E-mail: k.myshenkov@yandex.ru
A.Yu. Romanov - Ph.D. (Eng.), Chif Research Scientist, JSC «Mosoblenergo»
E-mail: aromanovit@gmail.com
Abstract:
Control system repairs of equipment is one of the key elements in the management of industrial enterprise. The purpose of the automated repair of the equipment management system in the company is to increase the production efficiency. Based on the structural analysis of complex repair of the equipment of a particular industrial enterprise management system developed by the authors generalized mathematical model of repairs of the equipment of the control system based on set theory. Determined the structure of the system and controls the object. The basic functions of the system: the formation of the schedule of repair work, planning to carry out repair work needs manpower planning needs to perform repair work in material resources, and analysis of the technical state of equipment Analysis of the actual repair work. Formulated objective functions repairs equipment management system optimization routine schedule maintenance work for an administrative schedule and optimize the operational schedule of repair work with respect to the planned schedule. Depending on the objectives of a particular enterprise objectives repair of the equipment management system can be as minimizing the total downtime of production equipment (increase rate of equipment availability) and maximization (uniform) load maintenance personnel of the enterprise, improve the efficiency of repair work when the predefined standards for repair as well as other technological and economic criteria. An important task for the planning functions and operational management of equipment repairs is the task of drawing up calendar repair work schedules. A mathematical formulation of the problem of scheduling repairs of technological equipment of industrial enterprises. This problem belongs to the class of scheduling problems with limited resources. heuristic method based on genetic algorithm was chosen on the basis of an analysis of methods for solving this class of problems. The algorithm and implements its software package to solve the problem. The results of solving the problem for a particular company. Our results can be used by companies and professionals involved in the development, implementation and operation maintenance management systems and repair of equipment for enterprises.
Pages: 22-29
References
- Akberdin R.Z. EHkonomicheskaja ehffektivnost vosstanovlenija oborudovanija i rezervy ee povyshenija. M.: Mashinostroenie. 1980. 185 s.
- Borisov JU.S. Organizacija remonta i tekhnicheskogo obsluzhivanija oborudovanija. M.: Mashinostroenie. 1978. 360 s.
- Danilov S., Skvorcov, Nozdrina O. Avtomatizacija TOiR. KHronika vnedrenijj. [EHlektronnyjj resurs]. URL: http://www.prostoev.net/biblioteka/publikatsii/90-avtomatizatsiya-toir-khronika-vnedrenij(data obrashhenija 07.11.2016).
- Kubrin S.S., Sukmanov A.I. Metodika ocenki tekhnicheskogo sostojanija oborudovanija // Avtomatizacija v promyshlennosti. 2012. № 9. S. 41-44.
- Kac B.A. Vzaimodejjstvie informacionnojj sistemy TOiR s drugimi ASU predprijatija // Avtomatizacija v promyshlennosti. 2013. № 8. S. 43-46.
- Kac B.A., Antonenko I.N., Molchanov A.JU. Informacionnye sistemy upravlenija proizvodstvennymi aktivami // Avtomatizacija i novye tekhnologii. 2015. № 3. S. 74-78.
- Myshenkov K.S., Romanov A.JU. Analiz kompleksa vzaimosvjazannykh modelejj sistemy upravlenija remontami oborudovanija promyshlennogo predprijatija // Vestnik MGTU «Stankin». Nauchnyjj recenziruemyjj zhurnal. 2011. № 4(17). T. 2. S. 82-86.
- Tanaev V.S., SHkurba V.V. Vvedenie v teoriju raspisanijj. M.: Nauka. 1975. 256 s.
- Bellman R., Gross O. Some combinatorial problems arising in the theory of multistage processes // Journ. Soc. industr. and appl. mathematics. V. 2. № 3. 1945.
- Johnson S.M. Optimal two- and three-stage production schedules with setup times included // Nav. res. log. quart. V. 1. № 1. 1954.
- Konvejj R.V., Maksvell V.L., Miller L.V. Teorija raspisanijj. M.: Nauka. 1975.
- Batishhev D.I., Priluckijj M.KH., Gudman EH.D., Norenkov I.P. Metod kombinirovanija ehvristik dlja reshenija kombinatornykh zadach uporjadochenija i raspredelenija resursov // Informacionnye tekhnologii. 1997. № 2. S. 29-32.
- Norenkov I.P. Kombinirovannye i geneticheskie algoritmy sostavlenija raspisanijj v zadachakh proektirovanija // Vestnik MGTU im. N.EH. Baumana. 1995. № 2. S. 36-43.
- Myshenkov K.S., Romanov A.JU. Metod reshenija zadachi kalendarnogo planirovanija remontov tekhnologicheskogo oborudovanija predprijatija s ispolzovaniem geneticheskogo algoritma // Nauka i obrazovanie: ehlektronnoe nauchno-tekhnicheskoe izdanie / MGTU im. N.EH. Baumana. 2011. № 9. [EHlektronnyjj resurs]. URL: http://technomag.bmstu.ru/doc/212208.html(data obrashhenija 07.11.2016).
- Hartmann S.A. Competitive Genetic Algorithm for Resource-Constrained Project Scheduling // Naval Research Logistics. 1998. V. 45. R. 733-750.
- Hartmann S.A. Self-Adapting Genetic Algorithm for Project Scheduling under Resource Constraints // Naval Research Logistics 2002. V. 49. R. 433-448.
- Holland H.J. Adaptation in Natural and Artificial Systems // University of Michigan Press, Ann Arbor. 1975.
- Svid. o gos. registr. progr. dlja EHVM № 2011617958 RF. Planirovanie remontov oborudovanija predprijatija na osnove geneticheskogo algoritma / K.S. Myshenkov, A.JU. Romanov. № 2011616166; Zajav. 16.08.2011; Zaregistr. 12.10.2011.